Ballsbridge Bankcentre

Architectural diagrams showing proposed building extension over existing blocks F, E, G, H, and the Serpentine Building, including section and elevation views with annotations of structural features, roof profiles, and landscaping elements.
Modern office building with black and white exterior and glass windows, parking lot with cars, trees, and a large metallic sculpture in front, under a clear blue sky.
Modern glass office building with balconies and outdoor planters, reflected in a window on a sunny day.
Modern office lobby with plants, a staircase with orange walls, large windows, polished floors, and seating areas.
Modern office lounge area with colorful armchairs, sofas, and large windows bringing in natural light.
Close-up view of modern apartment building with balconies, glass windows, and a blue sky reflecting off the glass surfaces.
Interior view of a modern building lobby with glass walls, a security checkpoint with turnstiles, a reception desk with phones and computers, colorful seating areas, and indoor plants.
Modern multi-story building with glass windows, concrete balconies with plants, and an outdoor planter with greenery.
Two levels of outdoor space with tiled concrete barriers and green plants on top, featuring a central white column and concrete support blocks.
A modern multi-story office building with large glass windows and white balconies, situated on a paved street with planters and greenery, under a blue sky.
Interior view of a modern multi-story office building with large glass windows, balconies with plants, and a seating area with sofas and armchairs.

Project Overview

This project involved the extension and refurbishment of a 1970’s office block at Bank Centre Ballsbridge for DAVY.  The extension comprised of one additional floor, and the refurbishment of the 1970;s architectural façade including new windows. The building was subject to a pre-let to Meta and was fully fitted out with cat A and Cat B finishes to there specification. The building sits on an existing shared basement with new end of journey facilities included.  The building achieves the best practice environmental standards, including BER A3, LEED GoldV4 as well as substantial embodied carbon saving due the retention of the existing structure.

Completed: 2023

Client: Davy

RIAI Stages: 1 to 8

GIA: 212,000sqft

BER: A3

LEED: Gold

Air Tightness: 1.5m3/he.m2 @ 60pa